Roof replacement in Los Angeles
A full tear-off, a new roof and the paperwork that goes with it. We pull the permit and meet the city inspector.
- Free estimatesWritten, line-item pricing
- Permits handledLADBS and surrounding cities
- Written warrantyOn materials and workmanship

Down to the deck and back up.
A new roof is only as good as what's under it. Every replacement includes the layers you won't see once it's done.
- Tear-off of old roofing down to the deck
- Repair or replacement of damaged decking
- New underlayment and flashing at every wall, chimney and vent
- Your choice of roof: tile, shingle, slate, metal or flat
- Ridge and attic ventilation
- Daily cleanup and a magnetic nail sweep
- City permit and final inspection
- Written warranty on materials and workmanship
How a replacement works
Inspection
We measure the roof and photograph its condition.
Written estimate
Line-item pricing with material options side by side.
Permit
We file with LADBS or your city.
Tear-off and install
Most homes take a few days. Tile and slate take longer.
Final inspection
The city signs off and you get your warranty in writing.
Codes we handle for you.
Permits
A reroof in the City of Los Angeles needs a building permit and a city inspection, and nearby cities have similar rules. We file it and meet the inspector.
Fire zones
Homes in a Very High Fire Hazard Severity Zone need a Class A fire-rated roof. We'll check your address and quote materials that qualify.
Cool roofs
California's Title 24 energy code can require a reflective cool roof when you replace one, depending on the roof's slope and location. We tell you up front if it applies.
Common questions
How long does a roof replacement take?
Most shingle roofs on a typical LA house take a few days. Tile and slate roofs take longer because each piece is set by hand. We give you a schedule with your estimate.
How much does a new roof cost?
It depends on the size and steepness of the roof, the material, and what we find under the old roof. Shingle usually costs the least, then metal, then tile and slate. Your written estimate breaks out every line.
Do I need to be home during the work?
No, as long as we can reach the roof and you're reachable by phone. We'll walk the finished roof with you at the end.
Do you offer financing?
Ask us about current financing options when we give you the estimate.
Plan your new roof.
Tell us a little about the house. We'll call within one business day to schedule a visit.
(323) 745-1116




